A well-known hospital in the Netherlands carried out a large-scale renovation of the buildings and the WTB and E installations. During such a project, the healthcare environment must remain functional. Temporary cooling is not a luxury, but rather part of the continuity.
Van Abeelen Rental Solutions provided a temporary cooling solution for the summer months, with 200 kW cooling capacity for water from +12°C to +6°C.
Cooling capacity during construction and renovation
A hospital project revolves around certainty. The temporary installation must perform reliably, be safely connected, and fit within the renovation schedule. Especially during the summer months, when cooling capacity becomes particularly strained.
| Project component | Implementation |
|---|---|
| Application | Temporary cooling of hospitals |
| Situation | Renovation of building and WTB/E installations |
| Cooling capacity | 200 kW |
| Temperature trajectory | +12°C / +6°C water |
| Period | Summer months |
| Division | Van Abeelen Rental Solutions |
Rental cooling with a focus on continuity
With a temporary cooling system, the cooling supply remains available while the fixed systems are being worked on. This prevents unnecessary risks and allows the renovation to be carried out according to plan.
Van Abeelen Rental Solutions provides the technical coordination, delivery, connection and service. Conveniently arranged, with short lines and technicians who know what is needed on site.
Need temporary cooling in healthcare?
Van Abeelen Rental Solutions supplies temporary cooling and air conditioning systems for buildings where continuity is crucial.
Contact Rental Solutions
Call +31 (0)161 219 031 or mail to [email protected].