A well-known hospital in the Netherlands carried out a large-scale renovation of its buildings and the mechanical and electrical installations. During such a process, the care environment must remain operational. Temporary cooling is then not a luxury, but part of business continuity.
Van Abeelen Rental Solutions provided a temporary cooling solution for the summer months, with 200 kW cooling capacity for water from +12°C to +6°C.
Cooling capacity during construction and renovation
A hospital project is all about certainty. The temporary installation must perform reliably, be connected safely, and fit within the schedule of the renovation. Especially in the summer months, when cooling capacity is subjected to extra heavy loads.
| Project component | Execution |
|---|---|
| Application | Temporary hospital cooling |
| Situation | Renovation of building and HVAC/electrical installations |
| cooling capacity | 200 kW |
| Temperature profile | +12°C / +6°C water |
| Period | Summer months |
| Division | Van Abeelen Rental Solutions |
Temporary cooling with a focus on continuity
With a temporary cooling system, the refrigeration supply remains available while work is being carried out on the permanent installations. This prevents unnecessary risks and provides the flexibility to carry out the renovation according to schedule.
Van Abeelen Rental Solutions handles the technical coordination, delivery, connection, and service. Practically arranged, with short communication lines and technicians who know what is needed on-site.
Temporary cooling needed in healthcare?
Van Abeelen Rental Solutions delivers temporary cooling and climate control systems for buildings where continuity matters.
Contact Rental Solutions
Bel +31 (0)161 219 031 or mail to [email protected].